Jetty Price Plastic Floating Dock Floating Dock for Marina

  • Audited Supplier
  • 6 yrs

Contact Supplier

Product Highlights

  • 30-Year Lifespan: Durable design with a 30-year lifespan under regular maintenance.
  • High Load Capacity: Supports 250-450kg per square meter for heavy-duty use.
  • Premium Materials: Constructed with Aluminum alloy frame, HDPE floats, and WPC decking.
  • SGS Certified: Product meets SGS certification standards for quality assurance.
  • 1-Year Warranty: Comprehensive 1-year warranty coverage for peace of mind.
  • Customizable Options: Customizable aluminum frame, decking, floats, and rubber fenders.

Product Images of Jetty Price Plastic Floating Dock Floating Dock for Marina

Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
Jetty Price Plastic Floating Dock Floating Dock for Marina pictures & photos
Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina
  • Jetty Price Plastic Floating Dock Floating Dock for Marina
    Jetty Price Plastic Floating Dock Floating Dock for Marina

Find Similar Products

Product Description

jetty price plastic floating dock floating dock for marina
Jetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for Marina
More Photos 

Jetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for MarinaJetty Price Plastic Floating Dock Floating Dock for Marina
Marine Supplies  Marina Dock Aluminum Floating Jetty 

 

          Marina Dock Aluminum Floating Jetty Information 

  Lifespan:

  30 years (should be maintined regularly)

  Load:

  250-450kg/square meter

  Freeboard:

  450-550mm

 Warranty:

  1 year 

  Screw:

  stainless steel 

  Frame:

  Galvanized Steel  / Aluminum alloy/ Concrete 

  Floats:

  HDPE floats  / aluminum floats

  Decking:

  WPC  decking


 

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASI211220". Items marked "verified" are certified.

Watch Video
Watch Video
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.
Guangzhou Manwang Construction Material Co., Ltd.

About Our Factory & Business Background

Address
Floor5, No5, Second Lane, Hecheng Village, Shiling Town, Guangzhou, Guangdong, China
Terms of Payment
T/T, Western Union, Money Gram
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Nearest Port
Shenzhen or Guangzhou

Our Production Capability & Technical Expertise

Main Products
Floating Dock, Pontoon, Jetty, Dock, Floating Jetty, Pier, Marina, Floating Pontoon, Aluminium Pontoon, Floating Marina

Our Industry Experience & Global Business Record

Export Year
2018-11-20
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the expected lifespan of the floating dock?
The floating dock has a lifespan of 30 years, provided it is maintained regularly.
What is the load capacity of the dock?
The dock can support a load of 250-450kg per square meter.
What materials are used for the frame and floats?
The frame is made of Galvanized Steel, Aluminum alloy, or Concrete, and the floats are HDPE or aluminum.
Is the product customizable?
Yes, you can customize the Aluminum Frame, Decking, Floats, and Rubber Fender specifications.
What is the warranty period?
We provide a 1-year warranty for the product.
What are the payment terms?
We accept T/T, Western Union, and Money Gram as payment methods.
What is the lead time for production?
Lead time is 1-3 months during peak season and within 15 workdays during the off-season.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now